Multi-level BoMs
Sub-assemblies, variants, kits, and revisions with engineering change control.
Production planning, BoMs, work centers, and quality checks, all connected to purchasing and finance so cost of goods is a number, not an estimate.
Work order WO/03649
In progressInstructionPlan production on real stock, record work where it happens, cost it automatically.
Planners schedule from a spreadsheet, purchasing orders from a different one, and the shop floor reports progress on paper that gets typed in at the end of the shift, if at all. By the time management sees a number, it's already out of date, and the real cost of a product is anyone's guess.
A manufacturing ERP fixes that by connecting the chain: demand creates production orders, production orders check material availability and reserve stock, operators record work and quality checks as they happen, and the cost of materials and time flows straight into accounting.
Odoo's MRP covers that chain for most discrete manufacturers, with bills of materials, routings, work centers, quality checks, and maintenance, all on the same database as sales, purchasing, and inventory.
Sub-assemblies, variants, kits, and revisions with engineering change control.
Material availability and work center capacity shown before orders are released.
Measurements and pass/fail checks attached to operations, with alerts on failure.
Preventive schedules and breakdown requests linked to work centers.
Operators start, pause, and finish work orders from a tablet next to the machine.
Material, labor, and overhead captured per production order.
| Workflow | Odoo apps | Typical extension |
|---|---|---|
| Product structure | Manufacturing (BoMs), PLM for change control | Configurator for made-to-order variants |
| Planning | Manufacturing, Inventory replenishment | Custom scheduling rules or forecasting |
| Execution | Manufacturing work orders on tablets | Machine or IoT data capture |
| Quality | Quality checks and alerts | Industry-specific inspection forms |
| Maintenance | Maintenance requests and plans | Sensor-based triggers |
| Subcontracting | Manufacturing subcontracting flows | Partner portal for subcontractors |
Op 10
Validate structures and units. Every MRP is only as good as its bills of materials.
Op 20
Define work centers, operations, and realistic times, starting with your highest-volume products.
Op 30
Run MRP with real stock and demand, in parallel with the old process until planners trust it.
Op 40
Tablet work orders, quality checks, and maintenance once planning is stable.
Op 50
Compare actual against standard costs and refine routings with real times.
Myth: Our production is too unique for standard MRP.
Reality: Most of it isn't. The unique parts, like a product configurator or a special inspection, are small extensions on a standard base.
Myth: Operators won't use tablets.
Reality: They will if the screen shows exactly their next job and takes one tap to record it.
Myth: We need perfect routing times before go-live.
Reality: Start with good estimates; recorded actuals will refine them within weeks.
Bills of materials that live partly in engineering files and partly in people's heads are the biggest risk. If the BoM is wrong, planning, purchasing, and costing are all wrong. We validate BoMs with engineering and the shop floor before go-live.
The second pitfall is skipping the parallel run. Planners need to see the new system produce sensible plans alongside the old method before they trust it, so we plan for that overlap.
Decide early how you'll measure time on the shop floor: per operation, per order, or only for key work centers. More detail gives better costing but asks more of operators, so we match the level of detail to the decisions you'll actually make with the data. Plan for maintenance windows and changeovers in capacity too, or schedules will look better on screen than on the floor.
| System | Into Odoo | Out of Odoo |
|---|---|---|
| Engineering tools | BoM and part data | Change requests |
| Machines and IoT | Counts, times, and alarms | Work order context |
| Suppliers | Confirmations and ASNs | Purchase orders and forecasts |
| Quality systems | Test results | Lots and work orders to inspect |
The biggest one is going live with inaccurate bills of materials. If BoMs and routings don't match how products are actually built, planning and costing are wrong from day one, and the shop floor quickly stops trusting the system. We validate BoMs against real production runs before cutover. The second is asking operators to record more than they will: a simple, reliable scan beats a detailed form nobody fills in.
Odoo's Manufacturing app helps manufacturers schedule, plan, and process manufacturing orders, and its work center control panel lets tablets on the shop floor control work orders in real time, including flagging maintenance needs and quality problemsSource [1]. Capturing data where work happens is what makes costing and planning numbers believable.
For traceability, Odoo uses lots to identify batches that were received, stored, shipped, or manufactured, supporting end-to-end traceability that matters for recalls and expiry datesSource [2]. We configure these standard capabilities first and reserve custom work for routings, quality checks, or machine connections that are specific to your plant.
Computer vision
Computer vision for defect detection, visual inspection, counting, and safety monitoring, connected to quality workflows in your ERP.
AIDemand forecasting
Machine learning demand forecasts by SKU and location, embedded in purchasing and replenishment, with accuracy tracked over time.
MobileOdoo mobile apps
Custom mobile apps for Odoo: barcode warehouse scanning, delivery and proof of delivery, field service, and offline sync.
Next step
Thirty minutes with an engineer, no slide deck required. You'll leave with a clearer picture, whether or not we work together.