Playwright
Reliable end-to-end tests across Chromium, Firefox, and WebKit.
We add the automated tests that let your team ship on Friday without flinching: unit, integration, end-to-end, accessibility, and performance checks in CI.
Test the risky paths first, run everything on every pull request, keep tests fast.
| Layer | What it checks | Speed |
|---|---|---|
| Unit | Functions and business rules | Milliseconds |
| Integration | Database, APIs, Odoo models | Seconds |
| End-to-end | Critical user journeys in a browser | Minutes |
| Non-functional | Accessibility, performance, security scans | Varies |
test("customer can place an order", async ({ page }) => {
await page.goto("/shop");
await page.getByRole("button", { name: "Add Ergonomic Chair" }).click();
await page.getByRole("link", { name: "Checkout" }).click();
await page.getByLabel("Email").fill("qa@example.com");
await page.getByRole("button", { name: "Place order" }).click();
await expect(page.getByText("Order confirmed")).toBeVisible();
});Every release carries a question: did this change break something that used to work? Without automated tests, the only answer is manual clicking, which is slow, incomplete, and skipped when deadlines are tight. Bugs then reach users, and teams become afraid to change code.
Automated tests answer that question in minutes on every change. Unit tests check individual functions, integration tests check that components work together, and end-to-end tests check the journeys users care about most, such as signing up, checking out, or posting an invoice.
We build test suites that are fast, reliable, and focused on risk. A small set of trustworthy tests on critical paths is worth more than thousands of flaky ones nobody believes.
| Type | Checks | Speed |
|---|---|---|
| Unit | Individual functions and components | Milliseconds |
| Integration | Services, database, and APIs together | Seconds |
| End-to-end | Complete user journeys in a real browser | Seconds to minutes |
| Visual regression | Unexpected changes in appearance | Seconds |
| Performance and load | Speed and capacity under realistic load | Minutes |
| Accessibility | Automated WCAG checks | Seconds |
Reliable end-to-end tests across Chromium, Firefox, and WebKit.
Vitest, Jest, pytest, and Odoo's test framework, matched to your stack.
k6 or Locust scenarios based on real traffic patterns.
Tests run on every pull request with clear, fast feedback.
Step 01
Identify the journeys and code where bugs cost the most.
Step 02
Set up frameworks, test data, and CI integration.
Step 03
Write end-to-end tests for the most important journeys.
Step 04
Add unit and integration tests where risk and change are highest.
Step 05
Keep tests fast and fix flakiness as part of normal work.
The first pitfall is flaky tests. Tests that fail randomly teach teams to ignore failures, so we fix or quarantine flaky tests immediately and design for stable test data.
The second is testing implementation details. Tests tied to internal structure break with every refactor; tests based on behavior survive change.
The third is slow suites. When tests take an hour, developers stop running them, so we keep the main suite fast and run heavier checks separately.
| Measure | Why it matters |
|---|---|
| Critical path coverage | Share of key journeys under test |
| Suite duration | How fast feedback arrives |
| Flaky test rate | How trustworthy failures are |
| Escaped defects | Bugs found by users instead of tests |
Consider an e-commerce team that manually checks checkout before each release and still ships the occasional broken payment flow. End-to-end tests now cover browsing, cart, checkout with test payments, and order confirmation on every pull request.
A failing test blocks the merge, the developer sees exactly which step broke, and releases stop depending on someone remembering to click through.
Success is a team that changes code confidently, knowing that critical journeys are checked automatically on every change and that a failing test means a real problem.
| If your problem is | Start with |
|---|---|
| Releases break critical journeys | End-to-end tests on those journeys |
| Logic bugs in calculations | Unit tests on the calculation code |
| Integrations fail silently | Integration and contract tests |
| The site slows under load | Load tests on key endpoints |
| Accessibility complaints | Automated accessibility checks in CI |
Myth: Automated tests replace manual testing.
Reality: They replace repetitive regression checks. Exploratory testing by people still finds issues automation misses.
Myth: 100% coverage means no bugs.
Reality: Coverage shows which code runs during tests, not whether behavior is correct. Focus on meaningful assertions.
Myth: Testing slows development down.
Reality: Good tests speed teams up by catching problems early and making changes safe.
Tests follow the same standards as production code: reviewed, readable, and organized by user journey. Shared helpers keep them short, and a weekly look at slow or flaky tests stops the suite from decaying as the product grows.
Ham Vocke's practical test pyramid gives the shape we aim for: lots of small and fast unit tests, a moderate number of coarser-grained tests, and very few high-level end-to-end testsSource [1]. End-to-end tests are valuable but slow and brittle, so we keep them for the journeys that matter most, such as checkout or invoicing.
To know whether testing is working, we track DORA's change fail rate, the share of deployments needing immediate intervention, and failed deployment recovery timeSource [2]. Both should fall as coverage improves on the risky paths.
CI/CD automation
CI/CD pipelines with automated tests, preview environments, GitOps deployments, and zero-downtime releases with fast rollback.
WebSaaS engineering
Build SaaS products that last: multi-tenant architecture, Stripe billing, auth, observability, and infrastructure sized for real growth.
OdooCustom Odoo modules
Upgrade-safe custom Odoo modules in Python and OWL: inheritance only, tested, documented, and OCA-style. No core patches, ever.
Next step
Thirty minutes with an engineer, no slide deck required. You'll leave with a clearer picture, whether or not we work together.